The Modified Rational Method extends the standard Rational Method to estimate runoff volume and size detention facilities. It analyzes multiple storm durations to find the critical storm that requires the most storage.
Key concepts:
The method is suitable for preliminary sizing of small detention facilities (typically < 200 acres).
| Land Use | C Value |
|---|---|
| Asphalt/concrete | 0.90 - 0.95 |
| Roofs | 0.85 - 0.95 |
| Commercial areas | 0.70 - 0.95 |
| Residential (1/4 acre lots) | 0.40 - 0.55 |
| Residential (1 acre lots) | 0.30 - 0.45 |
| Parks/open space | 0.10 - 0.25 |
Source: FHWA HEC-22 (2009), Table 3-1.